SOW Report
Contract 99415 REL 1: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED IDFG
Project Number:
Project Title:
Lower Clearwater and Potlatch Watersheds Habitat Improvements
Project Stage:
Implementation
Project Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
99415 REL 1
Contract Title:
2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED IDFG
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Issued
Contract Description:
The Lower Clearwater and Potlatch Watersheds Habitat Improvement project is intended to implement habitat restoration activities in the Potlatch River Basin as identified in The Accord. The 377,776-acre Potlatch River watershed is located in north-central Idaho and is the largest tributary in the lower Clearwater River. The Potlatch River is critical to wild Snake River steelhead. This project seeks to restore wild Snake River Steelhead to a robust, self-sustaining population within the Potlatch River through coordinated implementation of best management practices on private timber, agricultural and range lands, coordination of interagency watershed planning efforts, and continuation of watershed monitoring and evaluation. This proposal is consistent with the NWPCC Fish and Wildlife Program’s goal to develop habitat-based programs designed to rebuild healthy, naturally producing fish and wildlife populations by protecting, mitigating, and restoring habitats. This project is consistent with the objectives and strategies of the Clearwater Subbasin Management Plan.

This project is intended to implement the Potlatch River Watershed Management Plan - 2019 Amendment (Potlatch Plan). The Potlatch Plan has identified and prioritized limiting factors and restoration strategies critical to steelhead spawning and rearing within each subwatershed. Tier 1 priority tributaries for restoration work include: East Fork Potlatch River, Big Bear Creek (including Little Bear Creek), and Corral Creek. Projects will address limiting factors including removing migration barriers, increasing instream habitat complexity, reducing stream temperature and sediment load, increasing base flows, and reducing high spring run conditions. Implementation efforts will include but are not limited to repair, removal or replacement of old culverts and bridges, stream and floodplain reconnection, reservoir flow augmentation, installation of large woody debris and other instream habitat structures, implementation of erosion/sediment control structures, riparian planting, livestock exclusion fencing, off-site water development, and protection of riparian and floodplain areas through easements or direct purchase.

This contract is with the Idaho Office of Species Conservation (OSC), which will become known as the Office of Species, Minerals, and Energy Coordination (OSMEC) as of July 1, 2026, per Idaho House Bill 737.  It covers 2026-2028 actions by the Idaho Department of Fish and Game (IDFG) for the Lower Clearwater and Potlatch Watersheds Habitat Improvement project and Trout Unlimited (TU) for the Lower Mainstem Clearwater Steelhead Population Group Restoration project.

IDFG actions in this contract include West Fork Little Bear Creek Sharrock-Becker Habitat Improvement Project implementation; Spring Valley Reservoir Flow Augmentation Development design and engineering; West Fork Little Bear Creek #3 design; State Highway 8 Big Meadow Creek Culvert Replacement design; developing outreach materials; general habitat repair and maintenance; and the identification and selection of new work for future implementation.  

TU actions in this contract include Clear Creek AOPs Culverts design and engineering; Clear Creek knotweed treatment; Orofino Creek fish passage analysis design and engineering; and engineering; and Orofino Creek Watershed Genetic Assessment.
Account Type(s):
Expense
Contract Start Date:
07/01/2026
Contract End Date:
06/30/2028
Current Contract Value:
$1,630,832
Expenditures:

* Expenditures data includes accruals and are based on data through 30-Jun-2026.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Accrual category:
Planning & Design
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Ryan Banks Idaho Governor's Office of Species Conservation Yes Contract Manager ryan.banks@osc.idaho.gov (208) 791-3014
Matt Belnap Idaho Department of Fish and Game (IDFG) Yes Technical Contact matt.belnap@idfg.idaho.gov (208) 569-1283
Gary Byrne Idaho Department of Fish and Game (IDFG) Yes Technical Contact gary.byrne@idfg.idaho.gov (208) 287-2778
Mike Edmondson Idaho Governor's Office of Species Conservation Yes Supervisor mike.edmondson@osc.idaho.gov (208) 334-2189
Brenda Erhardt Latah Soil and Water Conservation District (SWCD) Yes Technical Contact berhardt@latahswcd.org (208) 874-3821
Graham Freeman Idaho Governor's Office of Species Conservation Yes Supervisor graham.freeman@osc.idaho.gov (208) 332-1555
Rachel Green Bonneville Power Administration No CO Assistant rjgreen@bpa.gov (503) 230-3882
Robert Hand Idaho Department of Fish and Game (IDFG) Yes Technical Contact robert.hand@idfg.idaho.gov (208) 750-4209
Andy Hill Latah Soil and Water Conservation District (SWCD) Yes Technical Contact ahill@latahswcd.org (208) 315-0907
Amy Hines Idaho Governor's Office of Species Conservation Yes Contract Manager amy.hines@osc.idaho.gov (208) 332-1557
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Dalton Lebeda Trout Unlimited (TU) Yes Technical Contact dalton.lebeda@tu.org (319) 929-5817
Aaron Penvose Trout Unlimited (TU) Yes Technical Contact apenvose@tu.org (509) 888-0970
JESSICA POWER Bonneville Power Administration Yes Contracting Officer jdpower@bpa.gov (503) 230-4023
Jacquelyn Schei Bonneville Power Administration Yes Env. Compliance Lead jlschei@bpa.gov (503) 230-5893
Matthew Schwartz Bonneville Power Administration Yes COR mdschwartz@bpa.gov (503) 230-4225
Ken Stinson Latah Soil and Water Conservation District (SWCD) Yes Interested Party kstinson@latahswcd.org (509) 338-2549
George Zamora Latah Soil and Water Conservation District (SWCD) Yes Technical Contact gzamora@latahswcd.org (208) 874-7982


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance and Consultation Review A: 165. Environmental Compliance and Consultation Review 06/30/2028
Effective implementation management and timely contract administration B: 119. Routine/daily administration of work elements 06/30/2028
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish C: 114. Lower Clearwater/Potlatch Project Identification 06/30/2028
Attend Potlatch Implementation Group and subcommittee meetings. D: 191. Watershed Coordination 06/30/2028
Complete restoration on Sharrock-Becker properties on Big Meadow Creek. E: 29. IDFG: Sharrock-Becker Big Meadow Creek - habitat enhancement project implementation 07/31/2027
Develop and submit completed 100% design plans. F: 175. IDFG: Spring Valley Creek Flow Augmentation - Design 06/30/2027
Final design complete G: 175. IDFG: West Fork Little Bear Creek #3 - Design and engineering 06/30/2027
Develop and submit completed 100% design plans. H: 175. IDFG: State Highway 8 Big Meadow Creek Culvert Replacement - Design 06/30/2028
Distribute outreach videos and blogs. I: 99. IDFG: Outreach and Education 06/30/2028
Complete unscheduled maintenance/repairs as needed and adhere to environmental compliance requirements. J: 186. IDFG: Unscheduled maintenance & repair 06/30/2028
Develop and submit completed 100% design plans K: 175. TU: Upper Clear Creek AOPs Design and Engineering 06/30/2027
Remove knotweed on 2.5 acres L: 199. TU: Clear Creek Knotweed Treatment on McLean Property - Preconstruction 06/30/2027
Orofino Creek Fish Passage Analysis complete M: 115. TU: Orofino Creek Fish Passage Analysis 06/30/2028
Produce accessible, error-checked datasets N: 157. TU: Orofino Creek Genetic Assessment 06/30/2028
Completed Progress (Annual) Report O: 132. IDFG: Annual report for Contract 84063 Rel 21 (July 1, 2026-June 30, 2027). 03/31/2027
Completed Progress (Annual) Report P: 132. IDFG: Submit Progress Report for the period Jul 2027 to June 2028 06/30/2028
Completed Progress (Annual) Report Q: 132. TU Submit Progress Report for 84063 Rel 21 (Jul 2026-June 2027) 06/30/2027
Completed Progress (Annual) Report R: 132. TU: Submit Progress Report for the period Jul 2027 to June 2028 06/30/2028

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 199 Remove Vegetation
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 199 Remove Vegetation
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 4 instances of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance and Consultation Review
B 119 Routine/daily administration of work elements
C 114 Lower Clearwater/Potlatch Project Identification
D 191 Watershed Coordination
E 29 IDFG: Sharrock-Becker Big Meadow Creek - habitat enhancement project implementation 04/22/2026
F 175 IDFG: Spring Valley Creek Flow Augmentation - Design 04/22/2026
G 175 IDFG: West Fork Little Bear Creek #3 - Design and engineering
H 175 IDFG: State Highway 8 Big Meadow Creek Culvert Replacement - Design 04/22/2026
I 99 IDFG: Outreach and Education
J 186 IDFG: Unscheduled maintenance & repair
K 175 TU: Upper Clear Creek AOPs Design and Engineering
L 199 TU: Clear Creek Knotweed Treatment on McLean Property - Preconstruction
M 115 TU: Orofino Creek Fish Passage Analysis
N 157 TU: Orofino Creek Genetic Assessment 06/24/2026
O 132 IDFG: Annual report for Contract 84063 Rel 21 (July 1, 2026-June 30, 2027).
P 132 IDFG: Submit Progress Report for the period Jul 2027 to June 2028
Q 132 TU Submit Progress Report for 84063 Rel 21 (Jul 2026-June 2027)
R 132 TU: Submit Progress Report for the period Jul 2027 to June 2028
S 185 Periodic Status Reports for BPA