SOW Report
Contract 99415 REL 2: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED LATAH
Project Number:
Project Title:
Lower Clearwater and Potlatch Watersheds Habitat Improvements
Project Stage:
Implementation
Project Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
99415 REL 2
Contract Title:
2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED LATAH
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Issued
Contract Description:
The Lower Clearwater and Potlatch Watersheds Habitat Improvement project is intended to implement habitat restoration activities in the Potlatch River Basin as identified in The Accord. The 377,776-acre Potlatch River watershed is located in north-central Idaho and is the largest tributary in the lower Clearwater River. The Potlatch River is critical to wild Snake River steelhead. This project seeks to restore wild Snake River Steelhead to a robust, self-sustaining population within the Potlatch River through coordinated implementation of best management practices on private and public timberlands, agricultural and range lands, coordination of interagency watershed planning efforts, and continuation of watershed monitoring and evaluation. This proposal is consistent with the NWPCC Fish and Wildlife Program’s goal to develop habitat-based programs designed to rebuild healthy, naturally producing fish and wildlife populations by protecting, mitigating, and restoring habitats. This project is consistent with the objectives and strategies of the Clearwater Subbasin Management Plan.

The ESA Recovery Plan for Snake River Idaho Spring/Summer Chinook Salmon and Steelhead Populations delineates factors limiting steelhead production in the Potlatch River watershed including water temperature, instream flow, flow timing, sediment supply, floodplain connectivity, riparian vegetation, habitat complexity, and migration barriers (NMFS 2017, Ch 6, pg. 46).  Guidance to address these limiting factors includes restoring hydrologic and channel-forming processes to retain surface flow and reconnect floodplains, addressing channel incision, reestablishing riparian vegetation, improving large woody debris recruitment, and eliminating artificial fish migration barriers (NMFS 2017).  

This project is intended to implement the Potlatch River Watershed Management Plan - 2019 Amendment (Potlatch Plan). The Potlatch Plan has identified and prioritized limiting factors and restoration strategies critical to steelhead spawning and rearing within each subwatershed. Tier 1 priority tributaries for restoration work include: East Fork Potlatch River, Big Bear Creek (including Little Bear Creek), and Corral Creek. Projects will address limiting factors including migration barriers, instream habitat complexity, stream temperature, sediment loads, low summer base flows, and high spring runoff conditions. Implementation efforts to address these limiting factors will include but are not limited to repair, removal or replacement of old culverts and bridges, reconnecting streams with their floodplain, installation of large woody debris and other instream habitat structures, installation of erosion/sediment control structures, riparian planting, livestock exclusion fencing, off-site water development, and protection of riparian and floodplain areas through easements or direct purchase.

Consistent with the ecological goal as stated in the NWPCC Columbia River Basin 2020 Addendum, “Contribute to providing environmental conditions and processes that support the ecosystem functions necessary to restore healthy, self-sustaining, and harvestable populations of native anadromous and resident fish” (pg. 23), the Latah Soil and Water Conservation District’ (Latah SWCD) long-term approach to habitat restoration on private, state and federal lands focuses on process-based restoration strategies to build resilient natural systems. These strategies may require 5-10 years of annual monitoring to diminish potential threats (e.g., open range livestock) to the investments made by landowners, public land managers, Latah SWCD and affected funding agencies. The level of “protective maintenance” to protect these restoration investments will take place over a minimum of 10 years at diminishing maintenance levels as the restoration sites mature and the annual maintenance reviews and related actions increase site resilience and minimize the on-going threats. Within the 2017 Potlatch River Watershed Assessment and Total Maximum Daily Loads/Temperature TMDL, the Idaho Department of Environmental Quality "believes 10 -20 years may be a reasonable amount of time for achieving water quality standards" related to temperature.  

The Latah SWCD’s approach to large-scale restoration projects is to remain active with the affected landowners and public land managers until such time all parties believe the restoration sites have stabilized.  This approach increases the chance of long-term success with respect to landscape-scale habitat investments but does not lend itself to definitive short-term timelines often associated with year-to-year grant funding.  This will remain a challenge for all parties as implementation entities seek to alter the landscape in a way that creates long-term benefits related to steelhead recovery and broader watershed health throughout the Potlatch River system.

This current contract covers 2026-2028 actions by Latah Soil and Water Conservation District (Latah SWCD) for the Lower Clearwater and Potlatch Watersheds Habitat Improvement project.  

Latah SWCD planning and restoration actions in this contract include the following elements:

•    On-going effort to maintain the infrastructure required of Latah SWCD to directly implement conservation practices throughout the Potlatch River watershed. These on-going expenses include, but are not limited to, employment of administrative and planning staff, employment of seasonal field crews, purchase/maintenance of field supplies/equipment, lease of storage facilities, and vehicle expenses needed to transport ~ 12 – 15 individuals that work at varying degrees on steelhead habitat restoration efforts throughout the Potlatch River.  This effort is summarized within WE 119.

•    Developing engineering designs for process based habitat restoration projects, both on USFS managed lands near Feather Creek and at Two Mile Meadow along the East Fork Potlatch River. These efforts are summarized within WEs 175.

•    Provide implementation funding and construction oversight to replace an undersized and deteriorating culvert  to improve fish passage on Felton Creek. These efforts are summarized in WEs 184.

•    Continue revegetation of disturbed areas following culvert removal and new bridge construction on Big Meadow Creek (summarized in WE 198) and initiate revegetation efforts following the replacement of the Felton Creek culvert (WE 47; Felton Creek Culvert Replacement - Post Construction Revegetation).

•    Initiate revegetation efforts following instream implementation at the headwaters of Fry Creek and Little Boulder Creek (WEs

•    Continue riparian plantings and vegetation maintenance along the East Fork Potlatch River downstream of Jackson Creek (IDL managed lands), at the Corral Creek West Meadow Extension restoration project (private and IDL managed lands), and Fry Creek Meadow restoration project (IDL managed lands). These effort is summarized under WEs 198.

•    Implement low-tech structures in Little Boulder Creek to increase aquatic and floodplain complexity (WE 29).

•    Inspect and repair exclusion fencing at multiple sites to protect previously installed meadow restoration projects throughout the Potlatch River system from damage due to open range livestock to the degree funding allows. This effort is summarized in WE 186.

•  Continue the contract relationship with USGS to operate the stream gage at the mouth of the Potlatch River. This effort is summarized in WE 157.
Account Type(s):
Expense
Contract Start Date:
07/01/2026
Contract End Date:
06/30/2028
Current Contract Value:
$1,204,609
Expenditures:

* Expenditures data includes accruals and are based on data through 30-Jun-2026.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Accrual category:
Habitat Improvement
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Ryan Banks Idaho Governor's Office of Species Conservation Yes Contract Manager ryan.banks@osc.idaho.gov (208) 791-3014
Matt Belnap Idaho Department of Fish and Game (IDFG) Yes Technical Contact matt.belnap@idfg.idaho.gov (208) 569-1283
Gary Byrne Idaho Department of Fish and Game (IDFG) Yes Technical Contact gary.byrne@idfg.idaho.gov (208) 287-2778
Mike Edmondson Idaho Governor's Office of Species Conservation Yes Supervisor mike.edmondson@osc.idaho.gov (208) 334-2189
Brenda Erhardt Latah Soil and Water Conservation District (SWCD) Yes Technical Contact berhardt@latahswcd.org (208) 874-3821
Graham Freeman Idaho Governor's Office of Species Conservation Yes Supervisor graham.freeman@osc.idaho.gov (208) 332-1555
Rachel Green Bonneville Power Administration No CO Assistant rjgreen@bpa.gov (503) 230-3882
Robert Hand Idaho Department of Fish and Game (IDFG) Yes Technical Contact robert.hand@idfg.idaho.gov (208) 750-4209
Andy Hill Latah Soil and Water Conservation District (SWCD) Yes Technical Contact ahill@latahswcd.org (208) 315-0907
Amy Hines Idaho Governor's Office of Species Conservation Yes Contract Manager amy.hines@osc.idaho.gov (208) 332-1557
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Ryan Lawrence Latah Soil and Water Conservation District (SWCD) Yes Technical Contact rlawrence@latahswcd.org (208) 669-2027
JESSICA POWER Bonneville Power Administration Yes Contracting Officer jdpower@bpa.gov (503) 230-4023
Jacquelyn Schei Bonneville Power Administration Yes Env. Compliance Lead jlschei@bpa.gov (503) 230-5893
Matthew Schwartz Bonneville Power Administration Yes COR mdschwartz@bpa.gov (503) 230-4225
George Zamora Latah Soil and Water Conservation District (SWCD) Yes Technical Contact gzamora@latahswcd.org (208) 874-7982


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance and Consultation Review A: 165. Environmental Compliance and Consultation Review 06/30/2028
Effective implementation management and timely contract administration B: 119. Routine/daily administration of work elements 06/30/2028
Complete restoration design 60% C: 175. Two Mile Meadow Phase III Restoration Design 06/30/2027
Complete restoration design 60% D: 175. West Fork Potlatch River/Feather Creek Restoration Design 06/30/2027
Complete native plantings E: 47. Fry Creek Headwaters - Revegetation 06/30/2028
Complete native plantings for fall 2026 and spring 2027 F: 198. Plant and Maintain Vegetation on Corral Creek- West Meadow Extension Restoration Project Site 06/30/2027
Complete native plantings for fall 2026 and spring 2027 G: 198. Plant and Maintain Vegetation on East Fork Potlatch River - IDL managed land near Jackson Creek 06/30/2027
Complete native plantings for fall 2026 and spring 2027 H: 198. Post Construction Revegetation - Big Meadow Creek Culvert Replacement 06/30/2027
Complete construction of structures for 2026 I: 29. Little Boulder Creek - Install Low-Tech Structures 06/30/2027
Complete native plantings for fall 2026 and spring 2027 J: 47. Little Boulder Creek - Revegetation 06/30/2027
Construction Management Complete K: 100. Felton Creek AOP - Construction Oversight 06/30/2027
Complete construction of culvert L: 184. Felton Creek AOP - Construction 06/30/2027
Complete native plantings and seeding for fall 2026 and spring 2027 M: 47. Felton Creek Culvert Replacement - Post Construction Revegetation 06/30/2027
Inspect and repair fencing as needed at previously completed project sites N: 186. Fence Maintenance & Repair 06/30/2027
Produce accessible, error-checked datasets O: 157. Maintain USGS Potlatch River Stream Gage 06/30/2028
Completed Progress (Annual) Report P: 132. Submit Progress Report for the period July 1, 2025 - August 30, 2026 05/30/2027
Completed Progress (Annual) Report Q: 132. Submit Progress Report for the period August 31, 2026 to Aug 31, 2027 05/30/2028

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 3 instances of WE 198 Maintain Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 3 instances of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance and Consultation Review
B 119 Routine/daily administration of work elements
C 175 Two Mile Meadow Phase III Restoration Design
D 175 West Fork Potlatch River/Feather Creek Restoration Design
E 47 Fry Creek Headwaters - Revegetation
F 198 Plant and Maintain Vegetation on Corral Creek- West Meadow Extension Restoration Project Site
G 198 Plant and Maintain Vegetation on East Fork Potlatch River - IDL managed land near Jackson Creek
H 198 Post Construction Revegetation - Big Meadow Creek Culvert Replacement
I 29 Little Boulder Creek - Install Low-Tech Structures
J 47 Little Boulder Creek - Revegetation
K 100 Felton Creek AOP - Construction Oversight
L 184 Felton Creek AOP - Construction
M 47 Felton Creek Culvert Replacement - Post Construction Revegetation
N 186 Fence Maintenance & Repair
O 157 Maintain USGS Potlatch River Stream Gage
P 132 Submit Progress Report for the period July 1, 2025 - August 30, 2026
Q 132 Submit Progress Report for the period August 31, 2026 to Aug 31, 2027
R 185 Periodic Status Reports for BPA