Contract 84045 REL 58: 1994-015-00 EXP IDAHO FISH SCREENING IMPROVEMENT
Project Number:
Project Title:
Idaho Fish Screening Improvement
BPA PM:
Project Stage:
Implementation
Project Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
84045 REL 58
Contract Title:
1994-015-00 EXP IDAHO FISH SCREENING IMPROVEMENT
Contract Continuation:
Previous: Next:
84045 REL 43: 1994-015-00 EXP IDAHO FISH SCREENING IMPROVEMENT
Contract Status:
Issued
Contract Description:
This contract provides management and operational support for a capital construction program dedicated to the protection all life stages of anadromous fish from water diversions, improvement of juvenile and adult fish passage at diversions, and improvement of stream flow conditions. Staff will process environmental regulatory documents, provide oversight to archaeologists and consulting engineers, engage in scoping, and negotiate with private landowners for habitat projects. All projects require compliance with State of Idaho and Federal regulations including, but not limited to, IDAPA Title 42, IDAPA Title 36, National Environmental Policy Act, Clean Water Act, Endangered Species Act, Federal Land Management Policy Act, National Historical Preservation Act, and Magnuson-Stevens Fishery Conservation and Management Act.

In this performance period, staff will produce designs for three screens: Lemhi River-38 (S-38 work element H) , Salmon River-42 (S-42, work element I), and Pahsimeroi River-05, (P-05, work element J). Under work elements D, E, and F, staff will provide management and operational support for the current capital construction program, 2007-399-00 Upper Salmon Screen Tributary Passage.  In this contract period, The IDFG Anadromous Fish Screen, Passage, and Habitat Program expects to finalize designs, fabricate, install, and maintain eight new fish screens including the North Fork Salmon River-02A (SNF-02A), Carmen Creek-01 (SCC-01), Hayden Creek-Hatchery (LHC-Hatchery), Herd Creek-01 (SEFHC-01), Herd Creek-02 (SEFHC-02) Big Timber Creek-04 (LBTC-04), Pahsimeroi River-04 (P-04),  and Little Salmon River-01 (SLS-01) fish screens.  This includes two new fish screens on previously unscreened diversions, and six older fish screens that are being replaced with new screens designed to meet NMFS Juvenile Fish Screen Criteria.  Additionally, new metal works for drum screens and drive systems for five existing screens, including two drums for Salmon River-09 (S-09), two drums for Salmon River-13/14 (S-13/14), two drums for Salmon River-28 (S-28), two drums for Salmon River-32 (S-32), and one drum for Lemhi River-41/42 (L-41/42).  The drums and drive systems need to be replaced due to the age and corrosion of the metal parts.  These projects combined to screen approximately 219 cubic feet per second (c.f.s.) in critical habitat for Chinook salmon, steelhead, and bull trout.    

Project Coordination: The IDFG coordinates other funding sources with this Bonneville Power Administration (BPA) contract in order to maximize the potential for anadromous fish recovery efforts in the Salmon River and Clearwater River Basins.  
Account Type(s):
Expense
Contract Start Date:
07/01/2026
Contract End Date:
06/30/2027
Current Contract Value:
$515,442
Expenditures:

* Expenditures data includes accruals and are based on data through 31-May-2026.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Accrual category:
Planning & Design
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Routine Administration of Contract 06/30/2027
Produce Environmental Compliance Documentation C: 165. Complete Environmental Compliance 06/30/2027
Agency Coordination D: 191. Agency Project Coordination 06/30/2027
Hold Technical Meetings for Project Coordination E: 191. Conduct Meetings for Restoration Planning 06/30/2027
Stream Investigations F: 115. Stream Investigations & Habitat Assessments 06/30/2027
Technical review comments G: 122. Technical Review and Recommendations for Fisheries Projects 06/30/2027
Topographic Electronic Files H: 175. Topographic Surveys -Lemhi River-38 (L-38) Fish Screen 06/30/2027
Topographic Electronic Files I: 175. Topographic Surveys - Salmon River-42 (S-42) Fish Screen 06/30/2027
Topographic Electronic Files J: 175. Topographic Surveys - Pahsimeroi River-05 (P-05) Fish Screen 06/30/2027
Completed Progress (Annual) Report K: 132. Submit Progress Report for the period July 1, 2025 through June 30, 2026 03/31/2027

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Routine Administration of Contract
C 165 Complete Environmental Compliance
D 191 Agency Project Coordination
E 191 Conduct Meetings for Restoration Planning
F 115 Stream Investigations & Habitat Assessments
G 122 Technical Review and Recommendations for Fisheries Projects
H 175 Topographic Surveys -Lemhi River-38 (L-38) Fish Screen
I 175 Topographic Surveys - Salmon River-42 (S-42) Fish Screen
J 175 Topographic Surveys - Pahsimeroi River-05 (P-05) Fish Screen
K 132 Submit Progress Report for the period July 1, 2025 through June 30, 2026